PPORTUNITY

Text Box: Focused On The Engineered Environment
Text Box: January, 2008
Text Box: www.jacco.com

Welcome to    PPORTUNITY, a monthly newsletter provided by Jacco & Associates. Jacco’s focus on engineering and design concepts will improve your HVAC system while significantly reducing design time, making you more productive for your clients.

Text Box: January Feature:
Text Box: January Question & Answer:

Question:  How many cubic feet of air is required to equal the same heat energy as 1ft³ water?

                   a.) 1,500      b.) 2,750      c.) 3,840     d.) 5,125

 

Prize:         Toshiba Portable DVD Player

 

Respond by February 1st with the correct answer to be entered in the raffle for this month’s prize!

Text Box: Last Month’s Question & Answer Winner!

QuestionWhat distance in feet is the maximum allowed for the liquid line in an ECOi VRF system?        

 

Answer:    985’ - Congratulation to Ralph DeLio for winning a Fuji A500 5.1MegaPixel Digital Camera!

 61 Milford Dr.  Hudson, OH  44236  Phone:(330) 463-0100  Fax:(330) 463-0101

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at opportunity@jacco.com

Ask Your Jacco Representative About Beka-KaRo Today!

Drywall or Insulation

 

Capillary Tubes

 

Plaster, Drywall or Drop Ceiling

Reduce your plenum heights & overall building height & cost!

Radiant cooling and heating is a high efficiency system in which chilled or hot water travels through capillary tube mats that are placed within plaster, drywall or drop ceilings.  The system is self regulating by absorbing the sensible heat given off by people and equipment within the space.  A complete radiant system consists of a chiller, boiler, pumps, capillary mats and sometimes a dedicated outdoor air system (DOAS).  Today’s owner, architect and engineer appreciate radiant systems due to their high efficiency, minimal ceiling requirements, low noise levels, indoor air quality, flexibility in design, and construction cost savings.  To complete the Beka-KaRo system, add an Aaon chiller/boiler plant with pumps and an Aaon DOAS unit, and you have a complete system ready to go with only 3 pieces of mechanical equipment!